Skip to content
SunGene
SunGene
HOW WE WORK

Product supply from Taiwan + China — custom packaging + corporate gifts

We buy the goods from the factory and resell to you. Our quotation covers production coordination, quality control, export handling, and post-shipment support. We inspect the goods ourselves before they leave the factory or the forwarder warehouse. The whole transaction sits between you and one Taiwan-registered company — not a three-way thread with an unreachable factory.
Sourcing partner

Our 5-step workflow

Requirement capture
Convert intent into testable requirements and acceptance criteria.
Supplier vetting
Shortlist suppliers with capability and risk screening.
RFQ normalization
Standardize scope so quotes are comparable and stable.
Pre-shipment inspection
Prove compliance with AQL sampling plan, video, and deviation log before container loading.
Handover & logistics
Deliver documentation, spares list, and verify shipment documents.

Request a quotation in 1 business day

5 fields. Our team replies the same day with a buyer-facing quotation, lead time, and the price band you should expect.

No spam. Your details are used only to prepare your quotation. Privacy Policy.

What you get with every shipment

Comparable RFQ scope + spec alignment
Supplier qualification evidence + risk notes
Pre-shipment inspection checklist + AQL sampling plan
Deviation log with corrective actions
Handover document package (specs, standards, barcodes)
Shipment document verification

Evidence you can ask us for at any time

If you want confidence, request evidence—not claims. Each item below is verifiable.

Written acceptance criteria
Turn promises into pass/fail conditions you can verify.
QC scope
- Inspected lot: ___ pcs
- AQL: 2.5 / 4.0
- Critical defects: 0
- Major defects: ___
- Pass / Fail: ___
Inspection video + report
Full pre-shipment inspection footage and AQL sampling results, not just a sample.
Inspection evidence
- Video link: ___
- Samples: ___ pcs
- Result: ___
- Deviation: ___
Deviation log (with retest)
Every issue is logged with corrective action and retest evidence.
Deviation log
#12 Seal contamination
Action: add dust removal
Retest: pass
Date: ___
Handover document package
Product specs, material certs, packing lists, barcodes, compliance docs for traceable delivery.
Handover package
- Product spec
- Material cert
- Packing list + barcode
- Compliance doc
- Inspection report
Spare parts plan
Part numbers + photos + station mapping to reduce downtime after shipment.
Spares
Station: Sealing
Part: Heater bar
Qty: 2
Lead time: ___
Shipment document verification
Invoice, packing list, HS code, crate IDs aligned to avoid customs delays.
Shipping docs
Invoice: ___
Packing list: ___
HS code: ___
COO: ___
Minimum inputs to start
  • Product category + reference photos or Alibaba link
  • Quantity per shipment (e.g. 5,000 pcs)
  • Destination market / shipping country
  • Hard constraints: certification, lead time, branding, packaging spec
What we reply with (so you can compare)
  • Category path + critical constraints list
  • Comparable RFQ scope (including customization options)
  • Acceptance criteria draft (pre-shipment inspection)
  • Next data points we need from you

How we shortlist factories

Use one scorecard across Taiwan/China suppliers so you don’t compare only speed or lowest price.

AreaWeightWhat to check
Technical fit30%Product behavior, packaging format, throughput, interfaces
Quality system25%Checklists, incoming inspection, wiring standards, revision control
Inspection capability25%Inspection plan, AQL sampling, deviation handling and retest
Delivery & service20%Document package, spare plan, support workflow and escalation
Common red flags
  • No written acceptance criteria
  • No wiring diagrams or revision history
  • Key components change frequently without justification
  • No deviation log or retest evidence
  • Spare parts list without part numbers/photos/station mapping
How to control risk quickly
  • Normalize RFQ scope (including documents + pre-shipment inspection conditions)
  • Require deviation log + retest before shipment
  • Align milestone payments to inspection evidence
  • Demand packing list with item codes + photos + barcodes

How we earn trust the first time

Clear responsibilities
Trust is built through scope, documents, acceptance criteria, and evidence.
Evidence-based acceptance
Inspection video + AQL sampling results + closed deviations make every delivery traceable.
Cross-border execution
Taiwan + China presence supports faster coordination and risk control.
Trust evidence
Trust evidence
Trust evidence
Trust evidence

Helpful reading

Use these guides to clarify scope and risks before requesting quotes.

Resources
COMPARING YOUR OPTIONS

Honest comparisons before you commit

Request a quotation

Define your scope, and we’ll control the risk

Start with a quick assessment (product, output target, utilities, constraints). We reply with a configuration path and acceptance checklist.